Borealis Power – El Salvador

Borealis Power Plant .  Combustion Engine Performance Test .  Grid Regulator Audit .  San Salvador, El Salvador

Borealis Power Plant
Combustion Engine Performance Test
Grid Regulator Audit
San Salvador, El Salvador

Total Power 45.7 MW

ASME PTC 17

The purpose of the combustion engine evaluation was to determine the heat consumption curves of the engine for the full range of loads as well for the start-up and shutdown of the unit.

ThermoGen Power Services Inc. conducted this test  following the international accepted test protocol ASME PTC17-1973.

TGPS scope include the creation of a performance test procedure, provision of testing equipment and creating the final performance test report. The final report was approved by the government authorities and currently TGPS remains in the list of certified auditors after 6 years.

 

Why is Power Plant Efficiency Important?

Power Plant Efficiency is directly correlated to the business sustainability in terms of financial performance and long-term feasibility.