OEM – Pakistan

Total Power 160MW

ASME PTC 42

TGPS conducted the supervision of all the commissioning activities in the Zorlu Wind Farm project. TGPS supervised all the electrical, mechanical, operational and control tests during the commissioning phase for National Transmission and Dispatch Company Limited (NTD)

The test was conducted on 30 Vestas wind turbines V90.

Erdemir Steel Plant – Turkey

Total Power 150MW

ASME PTC 22

The unit experienced a sudden lost in power output and TGPS assisted in  testing the gas turbine to identify the potential cause of this power output loss. The gas turbine an MS6001B had gone through a major inspection and after the scheduled maintenance the unit was producing less power and the gas turbine heat rate was significant higher.

TGPS tested the gas turbine, gas turbine control system, gas turbine control instrumentation. The activities conducted on-site allowed to identify the cause of the performance loss and create a plan to try to recover this output in the next outage.

Indonesia Power – INDONESIA

Total Power 50 MW

Gas turbine upgrade performance test 50 MW– Westinghouse W251B12.

The purpose of the gas turbine performance test was to determine the power output and heat rate improvement after the Gas Turbine Upgrade.

TGPS conducted the evaluation by bringing testing instrumentation, creating a site-specific gas turbine test procedure, conducting the test and creating a gas turbine performance test report.

During the gas turbine evaluation, gas turbine operational data was retrieve from the gas turbine control system as well from the high-precision instrumentation that TGPS installed in a temporary basis.

Gas Turbine parameters has been tested:

  • Gas Turbine Corrected Power Output
  • Gas Turbine Corrected Heat Rate
  • Gas Turbine Efficiency

In addition, during the gas turbine evaluation, the following parameters were calculated. These values will serve as a reference for future performance evaluations of the unit.

  • Firing Temperature
  • Compressor Efficiency
  • Turbine Efficiency
  • Exhaust Temperature
  • Power Output Degradation
  • Heat Rate Degradation

The ASME PTC 22 – Gas Turbine Performance Test Code was followed.

http://www.indonesiapower.co.id/

OMV Samsun – Turkey

Total Power 870MW

ASME PTC 46, ASME PTC 22 & ASME PTC 6

Supervision Power Plant Performance Test.

TGPS was hired by Austrian-based company OMV to supervise the EPC and OEM performance testing activities. The site was the installation of two state of the art single-shaft GE combined cycle blocks power by 9FB gas turbines

The TGPS activities on-site included:

  • Revision of the contractual guarantees
  • Revision of the thermal performance test procedure.
  • Revision of the emissions and acoustic testing procedure
  • Supervision of the performance testing activities
  • Calculation of Performance Test Results
  • Revision of the EPC/OEM’s final performance test reports

Gama Enerji – Turkey

Total Power 840 MW

ASME PTC 46 – Combined Cycle Performance Test

2 x GE 9 FA gas turbines

Overall Combined Cycle Performance Test

TGPS supervised the execution of the New Combined Cyle Performance Test. The configuration of the plant is two GE 9 FB Gas Turbines in Combined Cycle with one Steam Turbine to determine the current Power Plant Performance Test (ASME PTC 46).

TGPS provided the service to supervise the preparations, the execution and the reporting of the performance evaluation program conducted by the various responsible projects in behalf of the power plant’s owner.

The program included the evaluation of the Thermal Performance Combined Cycle at Based load and Part Load, Emissions and Acoustic tests.

Kirikalle Combined Cycle

Arabian BEMCO Contracting Ltd – Saudi Arabia

Total Power 800MW

ASME PTC 46, ASME PTC 22, ASME PTC 6

The plant configuration is described as 307FA  (three GE MS7001FA+e gas turbines and 1 steam turbine in combined cycle). The purpose of the test is to determine the combined cycle power output and heat rate at rated conditions in accordance with the contractual specifications.

In addition TGPS will conduct a near field and far field acoustic test to ensure that the sound levels at the plant are in compliance with the acoustic guarantees.  TGPS will also conduct the emissions evaluation of the gas turbines’ exhaust gases.

The analysis will be executed on the basis of internationally accepted protocol ASME PTC 46 –Overall Plant Performance Test Protocol that describes the methodology to conduct an overall plant performance test.

All individual equipment testing will be done in accordance with ASME Performance test protocols such as: ASME PTC22, ASME PTC6.2, ASME PTC4.4, ASME PTC 19.1. For emissions and acoustic testing, reference test methods are EPA Methods 10 & 20 and ASME PTC 36 respectively.

Arabian BEMCO Contracting Ltd – Saudi Arabia

Total Power 3,200MW

ASME PTC 46, ASME PTC 22, ASME PTC 6

The plant configuration is described as 407EA (four GE MS7001EA gas turbines and 1 GE SC steam turbine in combined cycle block).  The PP10 project involves the conversion to combined cycle of the plant with the addition of 4 Heat Recovery Steam Generators, 1 Steam Turbine and the required Balance of Plant. The purpose of the absolute combined cycle conversion thermal performance test is to determine the corrected electrical output of the HRSG, Steam Turbine and Bottoming Cycle plant to compare to the contractual guarantees.

TGPS will perform the following Services:

  • Test the performance of the added equipment for the combined cycle conversion. The parameter of interest will be the steam power output measured in the high side voltage of the step-up transformer corrected to the reference conditions specified in the combined cycle conversion contract.
  • Conduct a near field and far field acoustic test to ensure that the sound levels at the plant are in compliance with the acoustic guarantees.
  • Conduct emissions evaluation of the gas turbines exhaust gases. The main parameters of interest will be NOx, O2 and CO2.

Arabian BEMCO Contracting Ltd – Saudi Arabia

Total Power 1,300MW

ASME PTC 46, ASME PTC 22, ASME PTC 6

The plant configuration is described as two 407FA blocks of (four GE MS7001FA gas turbines and 1 Alstom steam turbine in combined cycle) the site condensation system is based on an Air Cooled Condenser. TGPS will perform the following Services:

  • Preparations, Procedure, Testing and Report of the Thermal Performance Test of the two combined cycle blocks firing gas an liquid fuel.
  • Conduct a near field and far field acoustic test to ensure that the sound levels at the plant are in compliance with the acoustic guarantees.
  • Optional service of the emissions test of each gas turbine.

 

PRIMESOUTH – Lebanon

Total Power 970 MW

ASME PTC 46

Overall Power Plant Performance Test

Conducting Baseline Performance Test
Siemens SGT5-2000E (V94.2) & Ansaldo Steam Turbine

TGPS conducted and overall Power Plant Performance Test in two Combined Cycles  to determine the current plant performance.

ThermoGen Power Service Inc. conducted the following activities.

  • Prepared a Site Specific Performance Test Procedure
  • Provide High-Precisiont Instrumentation to install around the power plant
  • Direct all testing activities at site
  • Prepare a performance test report
  • Identify together with the client opportunity areas for improvement

 

Red Eléctrica de España

1,500MW

Baleares

3,600MW

Ceuta & Melilla

150MW

Total Power: 5,200MW

 

ASME PTC 46, ASME PTC 22, ASME PTC 6, ASME PTC 4, ASME PTC 17

TGPS has been hired by the grid operator, Red Electrica de España to supervise the execution of the test to determine the generation costs and start-up costs of 87 power plants around the islands of: Tenerife, Gran Canaria, Lanzarote, Ceuta, El Hierro, La Gomera, Palma de Mallorca and Ibiza.

In total the following number of plants are to be tested during 18 months period.

Performance testing to regulate the electrical systems in the islands.

Tests: 87

  • Combined Cycles: 9
  • Diesel: 43
  • Gas Turbine: 28
  • Steam Turbine: 5
  • Coal Plants: 2

The goal is to understand the generation costs of each plant to review the electricity prices.

Why is Power Plant Efficiency Important?

Power Plant Efficiency is directly correlated to the business sustainability in terms of financial performance and long-term feasibility.

Learn more