Grupo Cobra – United States of America

Total Power 200MW

ASME PTC 6

TGPS conducts thermal performance testing on one Alstom Steam Turbine at the project Crescent Dunes Solar Energy Project.

The test determined the steam turbines’ capacity, power output and heat rate at rated conditions.

The analysis will be executed on the basis of internationally accepted protocols ASME PTC 6 ASME PTC 19.1 and ASME PTC 46.

 

 

Why is Power Plant Efficiency Important?

Power Plant Efficiency is directly correlated to the business sustainability in terms of financial performance and long-term feasibility.