Central Térmica Andina .  2 Coal Plants .  Mejillones, Chile

Central Térmica Andina
2 Coal Plants
Mejillones, Chile

Total Power 300MW

ASME PTC 4

TGPS has been conducted the performance test for the Mejillones coal plant with using the technology of the Circulating Fluidized Bed Boiler.

The performance tests conducted from minimum to maximum loads.

The tests followed the internationally accepted protocols ASME PTC 4.1, ASME PTC 46, PTC 6.0, PTC 22 and ASME PTC 19.1. Based on these protocols, TGPS created individualized protocols. This document described the methodology, calculations and instrumentation to be used to perform thermal performance tests.

Why is Power Plant Efficiency Important?

Power Plant Efficiency is directly correlated to the business sustainability in terms of financial performance and long-term feasibility.