ENGIE CFBB Plant – Chile

Central Térmica Andina .  Circulating Fluidized Bed Boilers .  Mejillones, Chile

Central Térmica Andina
Circulating Fluidized Bed Boilers
Mejillones, Chile

CTH & CTA CFBB Power Plants – Total Power 330MW

Cobra Plantas Industriales (EPC Contractor) hired  to conduct the acceptance performance test in two CFBB power blocks. The Circulating Fluidized Bed Boilers manufactured by Foster Wheeler have low emissions and increased boiler efficiency.

 

has been conducted the performance test for the Mejillones coal plant with using the technology of the Circulating Fluidized Bed Boiler.

The performance tests conducted from minimum to maximum loads.

The tests followed the internationally accepted protocols ASME PTC 4.1, ASME PTC 46, PTC 6.0, PTC 22 and ASME PTC 19.1. Based on these protocols, TGPS created individualized protocols. This document described the methodology, calculations and instrumentation to be used to perform thermal performance tests.

 

ASME PTC 4

Why is Power Plant Efficiency Important?

Power Plant Efficiency is directly correlated to the business sustainability in terms of financial performance and long-term feasibility.