TECHNOLOGIES - power plant performance

Contact us

Steam Turbines

Steam Turbines

TGPS has conducted the thermal performance evaluation of steam turbines around the world. Our engineers have tested models from GE, Alstom, Siemens, Mitsubishi and Skoda amongst others. We have tested steam turbines used with fired boilers, combined cycles, thermosolar plants and geothermal applications. TGPS strictly follows the ASME PTC6 test protocol.

Click here to know more about our Recent Projects

Performance Test Procedure

For a combined cycle performance test, there are certain specific items to place special attention in the combined cycle performance test procedure.

  • Combined Cycle Isolation (thermal and electrical isolation)
  • Test Boundaries Definition
  • Combined Cycle Performance Guarantees
  • Testing Instrumentation
  • Calculation of final Combined Cycle Performance

TGPS has a diverse range of experience, not only in the CC configuration, but also in complex evaluation of projects that occurs in a multi-stage testing program as defined in the ASME PTC 46.

Acceptance Test vs Diagnostic Test

Depending on the objective of testing certain parameters are more critical than others. Only an experience power plant performance engineer can guide the process through the most efficient path to achieve the specific objectives. For a contractual performance test topics such as test uncertainty, performance guarantees are more relevant. In a diagnostic test, not only these parameters are important, but also looking to historical trends, power plant upgrades, operation modes, load cycling, among others. Our team uses the latest tools to diagnostic the combined cycle performance in an accurate and practical way. Results that can impact directly the combined cycle efficiency.

Why is Power Plant Efficiency Important?

Power Plant Efficiency is directly correlated to the business sustainability in terms of financial performance and long-term feasibility.

Learn more
Translate ยป