AES GENER – Chile

Services Overview


The generator AES GENER contracted TGPS to conduct testing of the two boilers to measure maximum capacity of the plant.

Scope


TGPS provided the following services as part of the functions of technical expert:


  • Submit a work plan for the performance of the maximum load tests
  • Develop the performance test protocol that specifies the terms and conditions of the test.
  • Provide testing instrumentation to measure the generator power output and auxiliary consumption in each power block.
  • Supervise the activities described in the performance test protocol to ensure compliance with the tests during plant trials.
  • Carry out a test report in which the recorded data.
  • Create the final coal power plant performance test report.


Project Details


Plant Name

Cochrane Power Plant 3

Country

Chile

Technology

Coal Fired Boiler

Total Power

532 MW


Request a quote


Thermogen Power Services Inc. can provide flexible solutions and flawless execution to meet your specific requirements.