TGPS conducted overall Power Plant Performance Test in two Circulating Fluidized Bed Boilers and two Steam Turbines to determine the current plant boiler performance (ASME PTC 4) and the Steam Turbine Performance (ASME PTC 6). TGPS also tested every individual equipment to diagnose and report shortfalls and opportunity.
- Coal Power Plant Performance Test
- Overall Power Plant Performance Test
- Diagnostic Test of Two Generation Blocks
Thermogen Power Service Inc. conducted the following activities.
- Prepared a Performance Test Procedure
- Provide High-Precision Instrumentation for measurement of key parameters
- Direct all testing activities at site
- Prepare a performance test report
- Identify together with the client opportunities for improvement