TGPS was hired by the grid operator, Red Electrica de España to supervise the execution of performance testing to regulate the electrical systems in the islands.
- ASME PTC 46
- ASME PTC 22
- ASME PTC 6
- ASME PTC 4
- ASME PTC 17
The goal was to determine the generation costs and start-up costs of 87 power plants throughout the islands of: Tenerife, Gran Canaria, Lanzarote, Ceuta, El Hierro, La Gomera, Palma de Mallorca and Ibiza.
87 plants were tested over an 18-month period.