Red Eléctrica De España
Services Overview

Total number of tests: 87

  • Combined Cycles: 9
  • Diesel: 43
  • Gas Turbine: 28
  • Steam Turbine: 5
  • Coal Plants: 2

Total Power: 5,750 MW

  • Canarias – 2,000 MW
  • Baleares – 3,600 MW
  • Ceuta & Melilla – 150 MW
Scope

TGPS was hired by the grid operator, Red Electrica de España to supervise the execution of performance testing to regulate the electrical systems in the islands.

  • ASME PTC 46
  • ASME PTC 22
  • ASME PTC 6
  • ASME PTC 4
  • ASME PTC 17

The goal was to determine the generation costs and start-up costs of 87 power plants throughout the islands of: Tenerife, Gran Canaria, Lanzarote, Ceuta, El Hierro, La Gomera, Palma de Mallorca and Ibiza.

87 plants were tested over an 18-month period.

Project Overview
Plant Name

Red Eléctrica de España

Country

Spain

Technology

Multiple

Total Power

5,750 MW